Business Insights · Business Analysis
Public railway construction and supporting transfer links
Official Tacheng materials refer to the third China–Kazakhstan cross-border railway as Ayagoz–Tacheng. Kazinform reports that the Bakhty–Ayagoz railway is under construction, and the official website of the Prime Minister of Kazakhstan lists it among projects scheduled to enter service by the end of 2027. Railway construction provides the public transport corridor context for connecting logistics facilities in China and Kazakhstan. The stated service date is a public infrastructure schedule, not confirmation that the railway is already open.

Official Tacheng materials refer to the third China–Kazakhstan cross-border railway as Ayagoz–Tacheng. Kazinform reports that the Bakhty–Ayagoz railway is under construction, and the official website of the Prime Minister of Kazakhstan lists it among projects scheduled to enter service by the end of 2027. Railway construction provides the public transport corridor context for connecting logistics facilities in China and Kazakhstan. The stated service date is a public infrastructure schedule, not confirmation that the railway is already open.
JINGNEXUS is developing terminal shuttle transport, container handover and industrial park services to connect mainline railways, arrival, departure and transloading terminals, AGV transfer links, warehousing parks and regional distribution. The company coordinates operating interfaces and permit-related liaison for cross-border road transfer links between Baketu on the Chinese side and Bakhty on the Kazakh side, connecting terminals and industrial parks in both countries. It carries out transfer infrastructure development and business coordination within the scope of supporting logistics activities, without claiming railway construction or operating rights on the basis of public railway development.
JINGNEXUS industrial development and business practices.
Back to News